Sign In | Join Free | My chinalane.org
China Jiangsu SunRise Environmental Technology Co.,ltd logo
Jiangsu SunRise Environmental Technology Co.,ltd
Jiangsu SunRise Environmental Protection Technology Co., Ltd.
Active Member

5 Years

Home > Raw Material Hopper >

ISO9001 3*4kw Raw Material Bin, Carbon Steel Raw Material Silo

Jiangsu SunRise Environmental Technology Co.,ltd
Contact Now

ISO9001 3*4kw Raw Material Bin, Carbon Steel Raw Material Silo

  • 1
  • 2

Brand Name : Jiangsu Sunrise

Model Number : LXLCO120C

Place of Origin : Jiangsu Sunrise

MOQ : 1 unit

Price : Negotiate

Payment Terms : T/T

Supply Ability : 1 unit 30day

Delivery Time : 30day

Packaging Details : 7945*5365*2925

Certification : ISO9001

motor power : 3*4kw

motor brand : Simens

material : carbon steel

Reducer brand : JIE

model : LXLC0120C

shaft brand : SKF

shipping size : 7945*5365*2925

shipping weight : 11000kg

cover material : stainless steel

screw quantity : 3.Pcs

Contact Now

Model Is LXLC0120C Storage Material Raw Material Hopper

Raw Material Bins& Silo

The product line of bins includes raw material to meal bins and everything in between.

No matter what kind of meat, poultry or fish by-products you process, you will always need simple, rugged bins for moving, parking and storing everything from raw material and other inputs to your finished output.

Storage

In order to ensure the continuous supply of materials to the sintering machine, various raw materials have a certain storage time in the batching bin, and the storage time is determined according to the operation and maintenance of the raw material processing equipment. Generally, all materials are not less than 8h.

The storage time of various raw materials can be determined by referring to the table. To determine the storage time of the mixing material batching warehouse, the conditions of the mixing material yard supplying ore to the batching room and the influence caused by the sudden failure of the mixing and reclaimer should be considered.

The planned maintenance or failure time of the mixing material yard equipment should be longer The impact may not be considered. When this happens, the direct transport system of the storage yard temporarily supplies materials to the batching room. Silo anti-blocking measures Wet materials are easy to block the silo, and anti-blocking measures must be taken. According to the viscosity of the material, the lower part of the silo adopts different structural forms to prevent clogging.

For viscous materials, such as concentrates, fine ore with high viscosity, etc., the silo can be designed as a three-stage movable silo, and a vibrator is installed in the movable part, as shown in Figure a. For fine ore with lower viscosity, the upper part of the silo can be designed as a two-stage structure with a sudden spreading shape, and a vibrator is installed on the silo wall, as shown in Figure b.

For materials such as slaked lime and fuel, a vibrator can be installed directly on the wall of a general metal ore warehouse, as shown in Figure c. If the volume of the ore bin is large, it can be designed into an exponential curve to prevent blockage.

designed volume 20m³
input format side input
screw diameter

500mm

screw quantity 3.Pcs
material for body carbon steel
hydraulic cover material stainless steel
motor power 3*4kw
motor brand Simens
Reducer brand JIE
shaft brand SKF
shipping size 7945*5365*2925
shipping weight 11000kg

ISO9001 3*4kw Raw Material Bin, Carbon Steel Raw Material Silo


Product Tags:

3*4kw raw material bin

      

3*4kw raw material silo

      

ISO9001 raw material silo

      
Wholesale ISO9001 3*4kw Raw Material Bin, Carbon Steel Raw Material Silo from china suppliers

ISO9001 3*4kw Raw Material Bin, Carbon Steel Raw Material Silo Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Jiangsu SunRise Environmental Technology Co.,ltd
*Subject:
*Message:
Characters Remaining: (0/3000)